The M-1500 was designed and manufactured as a dual
tank system that allows the HDD Contractor two
methods of mixing his Bentonite mud requirements.
This system allows the operator to mix 750 gallons
of full yield mud in less then eight (8) minutes,
while holding 750 gallons of water reserve in the
second tank for the next mix, or mix 1500 gallons of
full yield mud in less then sixteen (16) minutes, in
one large batch. The operator controls the two
methods of mixing by changing the direction of flows
through the piping connections using the manual
operated full flow valves. The vacuum port located
in the mixing tee has the ability to draw water from
the second tank when being used as a reservoir and
the drill fluid can than be sent to your drilling
rig with-out the use of a second pump. This model
has been a popular choice of HDD Contactors due to
its small space saving footprint relative to its
capacity. Other power drives available.
|